Projects | 06 / 2026
Arcelor Mittal Gonvarri — production hall in Nitra
Share
LinkedIn
Facebook
E-mail
We have taken on the structural design and construction documentation for a new production hall with heavy technology.
The hall in the Nitra industrial park is to be used for cutting and processing steel coils. That means heavy loads, overhead cranes and dynamic loads that a standard logistics hall never has to deal with.
Why this is no ordinary hall
In steel processing, the load does not change smoothly — it changes in jumps. A crane carries several tens of tonnes from one end of the bay to the other in a matter of seconds. The structure has to withstand this a thousand times a day, for years, without fatigue cracks.
That is why we calculated not only static but also dynamic effects and the fatigue of selected details. The result is a system with fewer supports than the client's original concept — and yet with a greater margin where it matters.
What we delivered
Structural calculations, construction documentation and a bill of quantities for the tender. The contractor received a basis it could price without follow-up questions.
The project continues with designer's supervision during erection. The first elements are being installed in the autumn.